Itron 60W Endpoint Installation Guide

60w endpoint installation guide, introduces the installation methods of the device


Itron 60W Endpoint Installation Guide - cover page
Brand
iTRON
Category
Industrial Robot
Document type
Installation Guide
Language
English
Pages
32
File format
PDF
File size
1.8 MB
Published
19 October, 2023
Updated
19 October, 2023
MD5 checksum
7B3910B0039846EF7F41D2FEDB2A6088

About this manual

The Itron 60W is an AMR module designed to collect consumption and tamper information from water meters and report data in a bubble-up fashion. It supports various protocols for registers from manufacturers such as AMCO, Badger, Hersey, Neptune, and Sensus. The device features capabilities including leak detection, tamper indicators, and reverse flow detection, powered by a non-replaceable lithium battery with an expected life of 20 years.

What's inside

  • About the 60W Endpoint
  • Installation Options
  • Rod Mount
  • Wall Mount
  • Pipe Mount
  • Through-Lid Mount
  • Connecting to the Register
  • Verifying Operation
  • Wiring for Neptune Registers

Specifications

Battery Life20 years
Leak Detection Periodseven years
Compatible RegistersAMCO, Badger, Hersey, Neptune, Sensus

Frequently asked questions

What are the installation options for the 60W endpoint?

The endpoint can be installed using rod mount, wall mount, pipe mount, or through-lid mounting methods.

How is the 60W verified after installation?

Verification is performed using a G5R or FC200 reader to ensure the endpoint can be read and reports correct consumption.

Can the 60W be repaired or modified?

No, the unit cannot be modified or repaired by unauthorized personnel as this may void the warranty and cause non-compliance with FCC rules.

Download PDF (1.8 MB)

More iTRON Manuals


View all iTRON manuals →