Geotech geosquirt™ 12 VDC Purge Pump User Manual

geosquirt™ 12 VDC Purge Pump is a device used to remove liquid contamination. It can be used for water and other liquids. It can work continuously for 15 minutes and then needs to cool for 5 minutes.


Geotech geosquirt™ 12 VDC Purge Pump User Manual - cover page
Brand
Geotech
Document type
User Manual
Language
English
Pages
2
File format
PDF
File size
145 KB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
25D522B9E676F92062C3C81EF04E9506

About this manual

This manual provides step-by-step instructions for installing and operating the Geotech geosquirt™ 12 VDC Purge Pump. It includes safety warnings, operational limits, and cooling requirements. The pump is designed for water-only use and must be submerged. It is disposable with no repair parts, and troubleshooting covers power and flow issues. Maintenance involves cleaning with a three-bucket wash between uses.

What's inside

  • System Installation
  • System Operation
  • System Maintenance
  • System Troubleshooting
  • Replacement Parts List
  • System Specifications
  • Warranty

Specifications

Dimensions1.5" diameter x 13" length (4 cm diameter x 33 cm length)
Outlet Required3/8" (10 mm) I.D. tubing
Power RequirementIndependent 12 VDC source
Current Draw3.5 amps (Single), 7.0 amps (Dual)
Operating TemperatureIn water up to 60°C (140°F) do not freeze pump
Flow RateUp to 2.5 GPM (11 LPM)
Maximum Recommended Depth55 feet (17 m)
Material of CasingABS plastic
Material of Pump ImpellerStainless steel
Material of SealRubber
Length of Motor Lead30 feet, 60 feet (9 m,18 m)

Frequently asked questions

Can the geosquirt™ pump silt or sand?

No, pumping silt or sand will destroy the pump and void any warranty.

What is the warranty period?

Thirty (30) days from date of first sale, covering defects in materials and workmanship.

What should I do if the pump won’t power up?

Check power connectors, power supply voltage, and motor lead for kinks or breaks.

How long should I pump before cooling?

Pump for up to 15 minutes, then cool for 5 minutes before resuming.

Download PDF (145 KB)

More Geotech Manuals


View all Geotech manuals →