Fleck 2510 Softener Installation & Start‐Up Guide
This guide provides instructions for installing and starting up the Fleck 2510 water softener. It includes a packing list detailing components for various grain capacities (32K, 48K, 64K, 80K) and outlines pre-installation requirements such as location selection and pressure checks. The document explains the system's operation, including the regeneration cycle, and provides step-by-step installation instructions for the control valve, bypass assembly, and plumbing connections.
| Minimum Pressure | 20 PSI |
|---|---|
| Maximum Pressure | 90 PSI |
| Regeneration Time | 90 minutes |
| Regeneration Frequency | every 14-21 days |
The regeneration process takes about 90 minutes.
A minimum of 20 PSI is required for the system.
No, do not use Teflon tape or pipe joint compound on the tank itself or the threads where the valve threads into the tank.