Flatpack2 PS System, SP2 356825.103 Quick Start Guide

The document provides guidance on installation, operation, commissioning and maintenance of the Smartpack2-based, DC Power Supply System.


Flatpack2 PS System, SP2 356825.103 Quick Start Guide - cover page
Brand
Eltek
Category
Industrial Supply
Document type
Quick Start Guide
Language
English
Pages
36
File format
PDF
File size
2.9 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
164F7F16D3084C8E85823DDE26A16364

About this manual

This document serves as a Quick Start Guide for the Eltek Flatpack2 PS System, SP2-based (Document Number: 356825.103). It covers the installation, operation, commissioning, and maintenance of this Smartpack2-based DC power supply system, which is designed for telecom and industrial applications. The system utilizes Flatpack2 rectifiers and a distributed control system suitable for cabinetized and outdoor applications.

What's inside

  • The Smartpack2-based Product Range
  • Brief Description, Smartpack2-based System
  • Installing Rectifiers & Opening Smartpack2 Master
  • Installation Steps
  • Mechanical Installation
  • Electrical Installation
  • Commissioning steps, Startup
  • Operation
  • Appendix Communication
  • Check Lists

Specifications

Product TypeSmartpack2-based DC Power Supply System
System ConfigurationIntegrated 4U Distribution, Cabinetized and Outdoor Applications
Voltage Systems24V, 48V or 60V
Installation LocationRestricted Access Locations (RAL)

Frequently asked questions

What is the document number for this guide?

The document number is 356825.103.

Can Flatpack2 rectifiers be hot-plugged?

Yes, new rectifiers must be hot-plugged in the power shelf one at a time, starting from ID number 1.

What are the minimum clearances required for cabinet access?

A minimum of 60 cm in front and 20 cm on top is required.

Download PDF (2.9 MB)

More Eltek Manuals


View all Eltek manuals →