TM EZ & LZ Series Bottle Filling Stations & Coolers Installation & Use Manual

This manual provides detailed instructions on how to operate and maintain the EZ & LZ series bottle filling stations and coolers. It includes safety information, assembly, installation, operation, maintenance and cleaning.


TM EZ & LZ Series Bottle Filling Stations & Coolers Installation & Use Manual - cover page
Brand
TM
Category
Other
Document type
User Manual
Language
English
Pages
10
File format
PDF
File size
1.3 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
6AE6169419D3C6E9FBAF5C5BAD829EFE

About this manual

This document is the Installation & Use Manual for TM EZ and LZ Series Bottle Filling Stations and Coolers, rated for commercial use only. It covers multiple models including the EZSDWS, EZS8WS, LZSDWS, and LZS8WS series in various configurations (1G, 2G, 3G).

The guide details the installation of hanger brackets, the cooler unit, water inlet lines, and drain traps. It includes specific instructions for electrical supply requirements, such as the need for a Ground Fault Circuit Interrupter (GFCI) for new installations, and ventilation clearance. The manual also provides startup procedures, including factory-set stream height adjustments, and cleaning guidelines for the stainless steel exterior panels.

What's inside

  • Installation of Hanger Brackets
  • Installation of Cooler
  • Water Inlet and Drain Installation
  • Electrical Supply Requirements
  • Ventilation Clearance
  • Startup Procedures
  • Stream Height Adjustment
  • Cleaning and Maintenance
  • Safety Warnings
  • General Instructions

Specifications

Refrigerant TypeHFC-134A
Minimum Ventilation Clearance6 inches (152 mm)
Factory Set Stream Height Pressure35 PSI
Recommended Water Supply Tube Size3/8" O.D. Unplated Copper Tube
Recommended Waste Outlet Size1-1/4" O.D.
Electrical Outlet TypeDuplex Outlet

Frequently asked questions

What type of refrigerant does this unit use?

The unit uses HFC-134A refrigerant.

What electrical safety device is required for new installations?

New installations must use a Ground Fault Circuit Interrupter (GFCI).

What is the factory-set pressure for the water stream height?

The stream height is factory set at 35 PSI.

What is the minimum clearance required between the cabinet louvers and the wall?

You must maintain a minimum clearance of 6 inches (152 mm) from the cabinet louvers to the wall.

Download PDF (1.3 MB)

More TM Manuals


View all TM manuals →