This book describes the installation, operation and maintenance of the Hitachi SJ700D-3 series inverter.
This document serves as a Quick Reference Guide for the Hitachi SJ700D-3 Series Inverter, intended to be kept handy for future reference. It outlines the essential steps for planning installation, installing the unit, commissioning, using, and servicing the inverter. Users are advised to read this guide along with the bundled Instruction Manual before operation to ensure safety and proper usage.
You must turn off the power supply and wait for 10 minutes or more before inspecting the inverter.
The DC voltage between terminals P and N must be 45 V or less before inspection.
You must close the terminal block cover before turning on the inverter power.