The manual provides detailed installation steps for Fast-Rack Ultra flush mount system.
The document serves as an illustrated installation guide for the Fast-Rack Ultra flush mount system. It outlines the scope of delivery, including specific part codes for feet, rails, clamps, and bonding components, along with a list of required tools such as torque wrenches and stud finders.
The manual details various mounting options suitable for different roof types, specifically focusing on the 'Ultra Flash' attachment method which anchors to roof trusses. It provides step-by-step instructions for positioning feet over trusses, calculating proper spacing between modules, securing rails with mid and end clamps, and establishing electrical bonding connections.
| Max Rail Span | 48 inches |
|---|---|
| Minimum Roof Edge Setback | 18 inches |
| Module Gap Height | 1/2 inch |
| Clamp Torque | 15 lbs. ft |
Installers must ensure compliance with OHSA regulations, use fall protection equipment, and observe electrical hazards.
Adequate setbacks of a minimum 18 inches are typically required.
Clamps should not be fully tightened until the next module is set into position, and final torque must reach 15 lbs. ft.