The document lists the required adhesive and building supplies, including various types of glue, sandpapers, drill bits, steam saws, etc. Additionally, the document provides recommended finishing materials and methods for completing the painting.
This document provides comprehensive assembly instructions for building a flight equipment field box known as the Super Tote. It details the specific adhesives, building supplies, finishing materials, and tools required to construct the unit properly.
The guide covers the step-by-step process of assembling the main box, battery box, drawers, and cradles. It includes suggestions for outfitting the box with flightline equipment such as power panels, batteries, starters, and fueling stations.
The manual recommends using wood glue (aliphatic resin) to achieve the strongest and most durable glue joints.
You should spray the accelerator from about 9 inches away to prevent bubbling and make a stronger joint.
You should start with a 3/8 inch drill bit to create the hole for routing power panel wires.