Agilent Technologies 210-MS 220-MS 225-MS GC/MS Ion Trap Mass Spectrometer Pre-installation Instructions

Describes the conditions required for installation of Varian 210-MS, 220-MS, and 225-MS GC/MS Ion Trap Mass Spectrometer, including laboratory safety requirements, personnel preparation, workbench space, temperature, humidity, power and gas


Agilent Technologies 210-MS 220-MS 225-MS GC/MS Ion Trap Mass Spectrometer Pre-installation Instructions - cover page
Brand
Agilent
Document type
Installation Guide
Language
English
Pages
14
File format
PDF
File size
270 KB
Published
07 June, 2012
Updated
30 September, 2023
MD5 checksum
46C741D393ED5227F7EBA121A9B7C4E0

About this manual

This document provides pre-installation instructions for the Agilent 210-MS, 220-MS, and 225-MS GC/MS Ion Trap Mass Spectrometers. It outlines a checklist of requirements that must be met before requesting installation, including site safety regulations, entrance clearance, bench space, and environmental conditions.

What's inside

  • Introduction
  • Safety
  • User Representative
  • Entrance Requirements
  • Bench Space and Load
  • Vibration Control
  • Temperature and Humidity
  • Ventilation System

Frequently asked questions

What is the optimal operating temperature range for the GC/MS?

The optimal operating temperature is between 16 and 30 °C (61-86 °F).

What are the relative humidity requirements for the laboratory?

Relative humidity must be maintained between 20% and 80%, with no condensation.

What is the minimum width required for the laboratory entrance?

The entrance to the laboratory must be at least 92 cm (36 in.) wide.

Download PDF (270 KB)

More Agilent Manuals


View all Agilent manuals →