Although the [Main Power V Timeout Fault] (Lct) has cleared, the inverter still will not energize. The manual's first action is: “Check the contactor and its wiring. Verify timeout status. Inspect the connections of the line, contactor, and inverter.”
- Model
- Schneider Electric ATV61
- Display shows
- [Input Contactor] (LCF)
- Type
- Fault code
- Source
- Manual p. 242
What LCF means
[Input Contactor] p. 242
Common causes
- Although the [Main Power V Timeout Fault] (Lct) has cleared, the inverter still will not energize. p. 242
What to do
- Check the contactor and its wiring. Verify timeout status. Inspect the connections of the line, contactor, and inverter. p. 242
Before you service the product, read the safety instructions in the manual p. 54.
If LCF is still not resolved
The manual gives no further instruction for this code. Open the code table in the PDF or contact Schneider Electric service.
This page summarises what the manufacturer’s manual says about LCF; each statement links to the page it comes from, and quoted lines are copied word for word. It is not a substitute for the manual or for a qualified installer. ManualLib is not affiliated with Schneider Electric. Found a mistake? Report an error.
