Key facts
- Brand
- Sun Microsystems
- Model
- Netra 240
- Category
- Servers Computer
- Industry
- Computers
- Documents
- 3
- Languages
- KO · JA · EN
- Last added
- 2026-11-22
Start here

Sun Netra 240 Server Management Manual
This document is the management manual for the Sun Netra 240 server, published by Sun Microsystems in July 2004. It serves as a guide for system administrators to install, configure, maintain, and troubleshoot the server hardware and software environment. The manual details the use of various diagnostic tools and command-line interfaces essential for server operations. This manual is written in Japanese.
Read onlineSun Microsystems Netra 240 specifications
| Document Part Number | 817-5014-11 |
|---|---|
| Document Revision | Revision A |
| Publication Date | July 2004 |
| Original Document Part Number | 817-2700-12 |
All Sun Microsystems Netra 240 documents by type
Mounting, wiring and first power-up. Read it before the hardware goes in.
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in these manuals
What tools are required for server installation?
The guide mentions Sun ALOM (Advanced Lights Out Manager) and Sun Install Check tool for configuration and monitoring.
What is the original document number for this manual?
The original document is the Netra 240 Server System Administration Guide, Part No: 817-2700-12.
What is the Netra 240 server management manual used for?
This manual provides instructions for using diagnostic tools and managing the Netra 240 server.
What are the operating temperature limits for the Netra 240 server?
The server can operate from 5 °C (41 °F) up to 40 °C (104 °F), with a short‑term range of –5 °C to 55 °C.
What are the DC power input requirements for the Netra 240 server?
The DC version requires an input voltage between –40 VDC and –75 VDC, a maximum current below 15 A, and a maximum power of 570 W.
