Key facts
- Brand
- PORONESON
- Model
- BK208
- Industry
- Industrial
- Documents
- 3
- Languages
- ZH
- Last added
- 2012-04-11
Start here

PORONESON BK208 Stand Type Machine control system ManualV3.0
The manual provides detailed instructions for installing the PORCHESON BK208 control system, including safety precautions, wiring, and mechanical mounting. It also describes the operation of the control panel, key functions, and how to configure parameters such as temperature, pressure, and flow.
Additional sections cover production management, system startup procedures, input/output status checks, and an appendix with connector pinouts and dimensional drawings. The document is organized into chapters that correspond to system configuration, key operation, parameter settings, and troubleshooting. This manual is written in Chinese.
PORONESON BK208 specifications
| LCD size (BK208C) | 5.7 inches, 320 × 240 px |
|---|---|
| LCD size (BK208K) | 6.0 inches, 640 × 480 px |
| Power supply | PV600 600 W |
| Communication cable | DB‑15F, 1 m to 8 m |
| Control CPU | Dual 32‑bit CPU |
Source: PORONESON BK208 Stand Type Machine control system ManualV3.0
All PORONESON BK208 documents by type
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in these manuals
What safety precautions must be observed before installing the BK208 control system?
Ensure external power is normal and set up safety interlocks before any work on the control system.
From: PORONESON BK208 Stand Type Machine control system ManualV3.0
How do I perform an input/output status check after installation?
After wiring, conduct a comprehensive check of all input and output points, then verify the status LEDs on the LCD.
From: PORONESON BK208 Stand Type Machine control system ManualV3.0
What is the warranty period for the BK208 controller?
The manual states a three‑year warranty for the LCD and a three‑year free‑repair period for the whole unit.
What safety precautions must be observed before installing the BK208 control system?
The manual states that external power sources must be normal, the system must be grounded, and all connections should be checked for safety before starting installation.
How is a full inspection performed after installing the BK208?
After installation, a complete inspection of power sources, main cabinet, wiring, and sensors must be carried out, followed by a functional test of input and output signals.
