Service manual for the Toyota 2AZ-FE engine charging system covering precautions, component locations, system diagram, on-vehicle inspection, generator…
This service manual covers the charging system for the Toyota 2AZ-FE engine. It provides safety precautions, component locations, a system diagram, and detailed on-vehicle inspection procedures for the battery, fuses, drive belt, wiring, and charging warning light.
The manual also includes step-by-step instructions for removing, disassembling, inspecting, reassembling, and installing the generator (alternator) assembly, along with torque specifications for all fasteners and electrical performance standards for no-load and loaded charging tests. This manual is written in Chinese.
| Standard battery voltage | 12.5 to 12.9 V at 20°C |
|---|---|
| No-load charging amperage | 10 A or less at 2000 rpm |
| No-load charging voltage | 13.2 to 14.8 V at 2000 rpm |
| Loaded charging amperage | 30 A or more at 2000 rpm |
| Generator mounting bolt A torque | 21 N*m (215 kgf*cm, 16 ft.*lbf) |
| Generator mounting bolt B torque | 52 N*m (530 kgf*cm, 38 ft.*lbf) |
| Generator terminal B nut torque | 9.8 N*m (100 kgf*cm, 87 in.*lbf) |
| Generator bracket bolt torque | 8.4 N*m (86 kgf*cm, 74 in.*lbf) |
The standard battery voltage is 12.5 to 12.9 V at 20°C.
The no-load charging voltage should be 13.2 to 14.8 V at 2000 rpm.
The loaded charging amperage should be 30 A or more at 2000 rpm with high beams and heater blower on HI.
Bolt A: 21 N*m (215 kgf*cm, 16 ft.*lbf); Bolt B: 52 N*m (530 kgf*cm, 38 ft.*lbf).