Service manual for STC Process Valve covering maintenance, disassembly, cleaning, reassembly, and electrical connection procedures.
This manual provides step-by-step instructions for maintaining STC Process Valve units, including direct acting and direct lift diaphragm valves. It details how to remove and reattach coils, clean plungers and diaphragms, and check for debris that may cause malfunction. Electrical connection procedures for DIN and grommet/lead wire connectors are also included.
The manual includes figures illustrating complete assemblies and component layouts, and warns users to check pressure, temperature, media, and voltage requirements before operation. This manual is written in Chinese.
Connect terminal 1 to positive and terminal 2 to negative.
Connect terminal 1 to HOT wire, terminal 2 to neutral wire, and connect ground to ground wire if required.