Pall Novasip USD 2398 Membrane Module Assembly and Installation Guide

This manual provides assembly, installation, operation, sterilization, and integrity testing instructions for the Pall Novasip USD 2398 membrane module.


Pall Novasip USD 2398 Membrane Module Assembly and Installation Guide - cover page
Brand
PALL
Category
Other
Document type
User Manual
Language
Chinese
Pages
8
File format
PDF
File size
276 KB
Published
21 October, 2026
Updated
21 October, 2026
MD5 checksum
E5FAFFDEB88D77FED553EEEC3464A82B

About this manual

This document details the assembly and installation procedures for the Pall Novasip USD 2398 membrane module. It emphasizes the importance of following specific steps to ensure safety and proper function, including checking packaging, verifying flow direction, and securing connections. The guide covers handling the device from receipt to final installation in a system. This manual is written in Chinese.

What's inside

  • Introduction
  • Specifications
  • Receiving the Equipment
  • Installation
  • Sterilization
  • Integrity Testing
  • Operation
  • Replacing the Filter
  • Safety and ATEX
  • Technical Support

Frequently asked questions

What is the recommended storage temperature for the membrane module?

Store the device in a clean, dry environment between 0 °C and 30 °C.

How should the membrane module be installed regarding flow direction?

Ensure the liquid flows from the inlet to the outlet, and check for flow direction markings on the device.

Download PDF (276 KB)

More PALL Manuals


View all PALL manuals →