Service and technical support manual for N9MSE (A Series) single stage PSC blower motor 35-inch tall high efficiency condensing gas furnaces.
This service and technical support manual covers the N9MSE (A Series) single stage, PSC blower motor, 35-inch tall, high efficiency condensing gas furnace. It is intended for qualified service technicians and covers start-up, adjustment, safety checks, and service procedures.
Topics include priming the condensate trap with water, purging gas lines, adjusting temperature rise, blower off delay, cooling airflow, and the thermostat heat anticipator, plus checking safety controls, retrieving stored fault codes, component self-test, maintenance, wiring diagram, troubleshooting flow chart, sequence of operation, and product nomenclature.
| Power supply | 115 V |
|---|---|
| Thermostat terminal voltage | 24 V |
| Natural gas service pressure maximum | 0.5 psig (14-in. w.c., 1125 Pa) |
| Natural gas service pressure minimum | 0.16 psig (4.5-in. w.c., 350 Pa) |
| Condensate trap priming tube size | 5/8-in. (16 mm) ID |
| Water used per collector box drain | One quart (liter) |
| Blower OFF delay jumper settings | 1 and 2, 2 and 3, 3 and 4, 5 and 6, 90, 120, 150, 180 |
The furnace must have a 115-v power supply properly connected and grounded, with proper polarity maintained for 115-v wiring.
Connect a 5/8-in. (16 mm) ID tube with funnel to the upper collector box drain connection and pour one quart of water so it runs through the collector box and overfills the trap, then repeat for the middle collector box drain port.
Service pressure must not exceed 0.5 psig (14-in. w.c., 1125 Pa) and must be no less than 0.16 psig (4.5-in. w.c., 350 Pa).
Purge the lines after all connections have been made and check for leaks with a commercially available soap solution; never purge into a combustion chamber or test with an open flame.