N9MSE (A Series) Single Stage PSC Blower Motor 35" Tall Condensing Gas Furnace Service Manual

Service and technical support manual for N9MSE (A Series) single stage PSC blower motor 35-inch tall high efficiency condensing gas furnaces.


N9MSE (A Series) Single Stage PSC Blower Motor 35" Tall Condensing Gas Furnace Service Manual - cover page
Category
Heater
Document type
Service Manual
Language
English
Pages
27
File format
PDF
File size
1.8 MB
Published
16 November, 2026
Updated
16 November, 2026
MD5 checksum
9807AE435E26693C7303278CC3081B6C

About this manual

This service and technical support manual covers the N9MSE (A Series) single stage, PSC blower motor, 35-inch tall, high efficiency condensing gas furnace. It is intended for qualified service technicians and covers start-up, adjustment, safety checks, and service procedures.

Topics include priming the condensate trap with water, purging gas lines, adjusting temperature rise, blower off delay, cooling airflow, and the thermostat heat anticipator, plus checking safety controls, retrieving stored fault codes, component self-test, maintenance, wiring diagram, troubleshooting flow chart, sequence of operation, and product nomenclature.

What's inside

  • Start-Up, Adjustment, and Safety Check
  • Prime Condensate Trap with Water
  • Purge Gas Lines
  • Adjust Temperature Rise
  • Adjust Blower Off Delay (Heat Mode)
  • Adjust Cooling Airflow
  • Adjust Thermostat Heat Anticipator
  • Check Safety Controls
  • Service and Maintenance Procedures
  • Troubleshooting Flow Chart

Specifications

Power supply115 V
Thermostat terminal voltage24 V
Natural gas service pressure maximum0.5 psig (14-in. w.c., 1125 Pa)
Natural gas service pressure minimum0.16 psig (4.5-in. w.c., 350 Pa)
Condensate trap priming tube size5/8-in. (16 mm) ID
Water used per collector box drainOne quart (liter)
Blower OFF delay jumper settings1 and 2, 2 and 3, 3 and 4, 5 and 6, 90, 120, 150, 180

Frequently asked questions

What power supply does the N9MSE furnace require?

The furnace must have a 115-v power supply properly connected and grounded, with proper polarity maintained for 115-v wiring.

How is the condensate trap primed with water?

Connect a 5/8-in. (16 mm) ID tube with funnel to the upper collector box drain connection and pour one quart of water so it runs through the collector box and overfills the trap, then repeat for the middle collector box drain port.

What is the allowed natural gas service pressure range?

Service pressure must not exceed 0.5 psig (14-in. w.c., 1125 Pa) and must be no less than 0.16 psig (4.5-in. w.c., 350 Pa).

How should gas lines be purged and leak checked?

Purge the lines after all connections have been made and check for leaks with a commercially available soap solution; never purge into a combustion chamber or test with an open flame.

Download PDF (1.8 MB)