Marley NC Series Cooling Tower User Manual

This manual provides instructions for the installation, operation, maintenance, and troubleshooting of Marley NC Series cooling towers.


Marley NC Series Cooling Tower User Manual - cover page
Brand
Marley
Category
Other
Document type
User Manual
Language
Chinese
Pages
32
File format
PDF
File size
1.5 MB
Published
25 October, 2026
Updated
25 October, 2026
MD5 checksum
F292871D6A447536445F0E5AA261EE5E

About this manual

This manual covers the complete lifecycle of the Marley NC Series cooling towers, including site preparation, transportation, lifting, and installation procedures. It details the assembly of multi-module units and the connection of water supply and return piping systems. This manual is written in Chinese.

What's inside

  • Cooling Tower Location
  • Cooling Tower Transport
  • Receiving the Cooling Tower
  • Lifting the Cooling Tower
  • Cooling Tower Installation
  • Cooling Tower Startup
  • Cooling Tower Operation
  • Winter Operation
  • Water Treatment and Blowdown
  • Cooling Tower Cleaning

Frequently asked questions

How many times per hour can the motor be started?

The motor should not be started more than six times per hour to prevent damage.

What percentage of the nameplate amperage should the overload protection be set to?

Overload protection must be set to 110% of the motor nameplate ampere rating.

Download PDF (1.5 MB)

More Marley Manuals


View all Marley manuals →