Marley MH Closed Circuit Cooling Tower is an efficient closed circuit cooling tower with advanced thermal performance and operational capabilities. This document provides information on the installation, operation, and maintenance of the closed circuit cooling tower.
About this manual
This manual provides detailed instructions for installing, transporting, lifting, and commissioning the Marley MH closed cooling tower. It includes safety guidelines, required tools, and step‑by‑step procedures for assembling the tower, connecting motor wiring, and setting up mechanical transmission components.
The document also covers routine operation, winter handling, water‑quality maintenance, cleaning, belt adjustment, seasonal shutdowns, fault diagnosis, and repair procedures. Contact information for Marley sales agents and optional accessories is included. This manual is written in Chinese.
What's inside
- Closed Cooling Tower Position
- Transportation
- Receiving
- Lifting
- Installation
- Motor Wiring
- Mechanical Transmission Equipment
- Startup
- Operation
- Winter Operation
Frequently asked questions
How should the cooling tower be lifted during installation?
All MH closed cooling towers must be lifted using the lifting hooks on the fan deck and water basin; forklifts are not allowed.
How many times per hour may the motor be started?
The motor should not be started more than six times per hour.
What bolt size is used to secure the tower to the support frame?
19 mm diameter bolts with washers are used to fasten the tower to the support steel frame.