Lennox G43UF Series Gas Furnace Installation Manual

Installation instructions for the Lennox G43UF Series gas furnace, covering safety, setup, venting, and electrical connections.


Lennox G43UF Series Gas Furnace Installation Manual - cover page
Brand
Lennox
Category
Other
Document type
Installation Guide
Language
English
Pages
47
File format
PDF
File size
796 KB
Published
29 October, 2026
Updated
29 October, 2026
MD5 checksum
1D88617DFA80CB28E77CF66B1AD254FA

About this manual

This manual provides installation instructions for the Lennox G43UF Series gas furnace, which is shipped ready for upflow installation. It covers Direct Vent and Non-Direct Vent applications, including specific requirements for combustion air, ventilation, and condensate drainage. The document details the necessary clearances, piping specifications, and electrical grounding procedures required for safe operation.

What's inside

  • Unit Dimensions
  • Parts Identification
  • Safety Information
  • Combustion, Dilution & Ventilation Air
  • Installation - Setting Equipment
  • Filters
  • Duct System
  • Gas Piping
  • Electrical
  • Unit Start-Up

Specifications

Certification StandardsCSA International certified to ANSI Z21.47 and CSA 2.3 standards
Minimum Return Air Temperature60°F (16°C)
Maximum Return Air Temperature85°F (29°C)

Frequently asked questions

Who must perform the installation and service?

Installation and service must be performed by a qualified installer, service agency, or the gas supplier.

Can the G43UF be used as a construction heater?

Lennox does not recommend using G43UF units as a construction heater, though it is possible if specific conditions regarding venting and air supply are met.

Download PDF (796 KB)

More Lennox Manuals


View all Lennox manuals →