A start-up checklist for the Hamilton 3VO system covering installation verification, venting, condensate drainage, water circulation, and safety controls.
This document serves as a start-up checklist for the Hamilton 3VO system, designed to be completed during installation and commissioning. It requires the distributor, salesperson, or installer to record specific site details, including location, serial number, and contact information.
The checklist guides the user through critical verification steps, including venting diagrams, condensate drainage checks, water circulation parameters, and temperature regulation tests. It also details procedures for the Z-INI (Zero Initialization) process, gas supply pressure recording, power supply verification, and outdoor air reset testing.
The lock-up pressure in the gas piping at the appliance inlet may not exceed 14 inches of water column at any time.
The Z-INI process should be completed in less than 10 minutes.
The question asking to run a Z-INI is presented every 15 minutes until the user selects YES.