Hamilton 3VO Start Up Checklist

A start-up checklist for the Hamilton 3VO system covering installation verification, venting, condensate drainage, water circulation, and safety controls.


Hamilton 3VO Start Up Checklist - cover page
Brand
Hamilton
Category
Other
Document type
User Manual
Language
English
Pages
3
File format
PDF
File size
368 KB
Published
02 November, 2026
Updated
02 November, 2026
MD5 checksum
13CE88E04A7DF6A87DB709CA623CAE27

About this manual

This document serves as a start-up checklist for the Hamilton 3VO system, designed to be completed during installation and commissioning. It requires the distributor, salesperson, or installer to record specific site details, including location, serial number, and contact information.

The checklist guides the user through critical verification steps, including venting diagrams, condensate drainage checks, water circulation parameters, and temperature regulation tests. It also details procedures for the Z-INI (Zero Initialization) process, gas supply pressure recording, power supply verification, and outdoor air reset testing.

What's inside

  • Venting
  • Condensate Drain
  • Water Circulation
  • Temperature Regulation
  • Z-INI Process
  • Gas Supply
  • Power Supply
  • Outdoor Air Reset
  • Safety Controls
  • Gateway Communication

Frequently asked questions

What is the maximum allowable lock-up pressure in the gas piping?

The lock-up pressure in the gas piping at the appliance inlet may not exceed 14 inches of water column at any time.

How long does the Z-INI process take to complete?

The Z-INI process should be completed in less than 10 minutes.

How often is the question to run a Z-INI presented on the screen?

The question asking to run a Z-INI is presented every 15 minutes until the user selects YES.

Download PDF (368 KB)

More Hamilton Manuals


View all Hamilton manuals →