This manual provides installation, configuration, operation, and maintenance instructions for GoodWe ES and SBP series energy storage inverters.
This user manual covers the ES Series (3.0-6.0kW G2 AC-coupled) and SBP Series (3.6-6.0kW G2) energy storage inverters. It is intended for professional personnel responsible for installation, configuration, testing, and maintenance of the equipment. The document includes safety precautions, product descriptions, and detailed technical data. This manual is written in Chinese.
Only qualified professional electrical technicians who are familiar with local regulations and have received specific training may install, operate, or maintain the equipment.
You must wear electrostatic gloves, wrist straps, and anti-static clothing to protect the inverter from static damage.
After the device is powered off, you must wait 5 minutes for it to fully discharge before proceeding.