Service manual for Aero-Motive AU-10 torque arm, covering installation, operation, maintenance, and safety.
This service manual provides instructions for installing, operating, and maintaining the Aero-Motive AU-10 torque arm. It includes safety warnings, mounting procedures, tool balancer installation, and a parts list. The manual emphasizes safety precautions to prevent injury or damage during use or service.
The torque arm is designed for use near vertical columns, with air tools connected via 1/4” NPT ports. Mounting involves attaching the arm to a vertical column and adjusting tool height. Balancer installation and adjustment are also covered, with references to additional balancer manuals for tension settings.
The AU-10 torque arm operates within 6” of and up to 28” away from a vertical column.
Air tools are connected to the bottom of the tool holder at the 1/4” NPT port.
Clip the top hook of the balancer to the ring on the trolley mount, then raise the arm with tool connector to the tool clip and fasten to the ring of the arm.