ABB ACS880 Multi-Drive Cabinet Mechanical Installation Guide

This guide provides instructions for the mechanical installation of the ABB ACS880 multi-drive cabinet, covering site checks, moving, positioning, and…


ABB ACS880 Multi-Drive Cabinet Mechanical Installation Guide - cover page
Brand
ABB
Category
Industrial Robot
Document type
Installation Guide
Language
Chinese
Pages
14
File format
PDF
File size
1.1 MB
Published
13 October, 2026
Updated
13 October, 2026
Model
ACS880
MD5 checksum
1A63138827E3CFA6DBB8C1996B99FF95

About this manual

This manual describes the mechanical installation procedures for the ABB ACS880 multi-drive cabinet. It covers essential steps including site inspection, required tools, delivery content verification, and moving the cabinet to its final location using cranes, forklifts, or dollies. The guide also details how to position the cabinet and secure it to the floor or wall. This manual is written in Chinese.

What's inside

  • Installation Site Inspection
  • Required Tools
  • Delivery Content Check
  • Moving the Cabinet
  • Final Positioning
  • Mounting to Floor and Wall
  • Connecting Cabinets Together
  • PE Busbar Connection
  • DC Busbar Connection
  • Welding Precautions

Specifications

Maximum floor level deviation5mm per 3m
Minimum clearance above cabinet500mm
Maximum cabinet door opening angle120°
Cabinet frame zinc layer thickness100-200μm

Frequently asked questions

What is the minimum clearance required above the cabinet?

A free space of 500mm must be retained between the top of the cabinet and the ceiling to ensure cooling.

Is welding recommended for fixing the cabinet?

Welding is not recommended. If necessary, the welding circuit return wire must be connected to the cabinet frame 0.5m away from the weld point to prevent damage.

Download PDF (1.1 MB)