Valve installation and usage manual, introducing the installation and disassembly precautions, maintenance points, working position of the valve, flow adjustment, and safety valve connection.
This manual provides step‑by‑step instructions for installing and commissioning CME 矽门 valves. It details preparation, cleaning, alignment, connection types (flange, thread, welding, clamp, packing), torque specifications and safety checks before and after installation.
It also describes proper operation, routine maintenance, daily inspection items, lubrication, storage, and troubleshooting tips to ensure reliable valve performance in industrial plant environments. This manual is written in Chinese.
| Maximum operating temperature | 200 °C |
|---|---|
| Supported connection types | Flange, Thread, Welding, Clamp, Packing |