CME Valve Installation Guide

This document is an installation and user manual for valves, providing detailed instructions and guidelines on the installation and usage of valves, including storage, cleaning, lubrication, and maintenance.


Brand
CME
Category
Industrial Robot
Document type
Installation Guide
Language
Chinese
Pages
16
File format
PDF
File size
184 KB
Updated
28 September, 2023
MD5 checksum
067A6D0D35A51B4A90C410F7AC4F03C9

About this manual

The document provides detailed instructions for valve installation, including preparation, handling, and the various connection methods such as flange, threaded, welded, clamp, and sleeve connections. It also covers safety precautions, required tools, and torque specifications for bolts.

Additional sections describe valve operation, routine maintenance, daily inspections, storage of new valves, and considerations for new projects. The guide emphasizes proper alignment, sealing, and regular checks to prevent leaks and ensure reliable performance. This manual is written in Chinese.

What's inside

  • Installation precautions
  • Connection methods
  • Flange connection steps
  • Threaded connection steps
  • Welding connection steps
  • Valve operation
  • Maintenance and management
  • Safety management
  • Daily inspection
  • Storage of new valves

Specifications

Maximum temperature for high‑temperature valves300 °C
Minimum temperature for high‑temperature valves200 °C

Frequently asked questions

How often should a valve be inspected after installation?

After installation the valve should be inspected regularly, checking the sealing surfaces, bolts, and any signs of wear.

Download PDF (184 KB)

More CME Manuals


View all CME manuals →