Swift 36 Shower Enclosure Installation Manual

This manual explains how to install a shower enclosure.


Swift 36 Shower Enclosure Installation Manual - cover page
Brand
Swift
Category
Other
Document type
Installation Guide
Language
English
Pages
28
File format
PDF
File size
3.5 MB
Published
17 November, 2023
Updated
17 November, 2023
MD5 checksum
546CB7B8896E39FD44AB7687AD6A6A1D

About this manual

This manual provides instructions for installing the Swift 36 shower enclosure. It emphasizes safety precautions, such as wearing safety glasses and gloves, and handling tempered glass with care to prevent shattering. The guide notes that installation requires at least two people and an estimated assembly time of 0.5 hours. It also advises consulting local building codes and checking the floor level before beginning.

What's inside

  • Safety Information
  • Preparation
  • Package Content
  • Shower Dimensions
  • Shower Frame Installation
  • Shower Door Installation
  • Sealing
  • Care and Maintenance

Frequently asked questions

What must be installed before the shower enclosure?

Install the shower base first, then the shower wall panels if applicable, then the shower enclosure.

How many people are needed to install the unit?

At least two people are needed to install the unit properly.

What safety gear should be worn while handling the shower?

Wear safety glasses and gloves while handling the shower.

What is the estimated assembly time for the shower?

The estimated assembly time for the shower is 0.5 h.

Download PDF (3.5 MB)

More Swift Manuals


View all Swift manuals →