OM1-8113-0201 CV3000 Series Control Valve HLS, HTS, HPS, HLC, HSC, HAV Type Instruction Manual

OM1-8113-0201 CV3000 Series Control Valve HLS, HTS, HPS, HLC, HSC, HAV Type Instruction Manual


OM1-8113-0201 CV3000 Series Control Valve HLS, HTS, HPS, HLC, HSC, HAV Type Instruction Manual - cover page
Brand
Azbil
Category
Other
Document type
User Manual
Language
Japanese
Pages
104
File format
PDF
File size
8.2 MB
Published
16 November, 2023
Updated
16 November, 2023
MD5 checksum
C0E43E4F27060C052BAEB2B7BED6F8BE

About this manual

This is the Japanese instruction manual for Azbil CV3000 series control valves in HLS, HTS, HPS, HLC, HSC, and HAV types. It covers unpacking and product confirmation, storage, safety precautions, and installation.

The manual gives installation and handling notes such as maintaining at least 10D straight pipe upstream and 6D downstream, supporting the valve and adjacent piping, and protecting the valve from radiant heat, salt damage, and corrosive atmospheres. It also describes removing flange protective covers at installation and tightening flange bolts and nuts diagonally with uniform torque. This manual is written in Japanese.

What's inside

  • Introduction
  • Unpacking and Product Confirmation
  • Storage Precautions
  • Safety Precautions
  • Precautions for Safe Work
  • Product Handling Precautions
  • Installation Precautions
  • Handling Precautions

Frequently asked questions

What should be confirmed before working on the valve?

Confirm that the pressure inside the piping has fallen to atmospheric pressure before starting work.

How much straight pipe length is required upstream and downstream of the valve?

Provide at least 10D of straight pipe upstream and at least 6D downstream, where D is the nominal pipe size.

How should flange bolts and nuts be tightened?

Tighten them diagonally and alternately with uniform torque.

Download PDF (8.2 MB)

More Azbil Manuals


View all Azbil manuals →