Humboldt HM-4150 Distribution Panel Constant Head Permeability Quick Start Guide

The HM-4150 Distribution Panel is a versatile laboratory instrument that can be used for a variety of experiments. The instrument features four independent chambers, each of which can be controlled individually. The HM-4150 Distribution Panel can also be connected to a computer for data acquisition and analysis.


Humboldt HM-4150 Distribution Panel Constant Head Permeability Quick Start Guide - cover page
Brand
Humboldt
Category
Test Set
Document type
Quick Start Guide
Language
English
Pages
22
File format
PDF
File size
2.7 MB
Published
11 November, 2023
Updated
11 November, 2023
Model
HM-4150
MD5 checksum
E6B9F6DB495FC0B5CCA65E1F284F2438

About this manual

This quick start guide for the Humboldt HM-4150 Distribution Panel describes the constant head permeability setup. It covers checking the base and top burette cross-sectional area, filling the top burette when needed, and connecting tubing to the top burette assembly and triaxial cell.

The guide then lists valve and tubing steps, including flushing the triaxial cell top input valve, closing all triaxial cell valves, and setting the base pressure and top pressure burette valves. It also includes a reference to instructions for performing falling head, rising tail permeability.

What's inside

  • Constant Head Permeability Setup
  • Base and Top Burette cross-sectional Area check / Verification
  • Fill the top burette
  • Connect the tubing to Top Burette Assembly
  • Connect the tubing to the Top Input on the Triaxial cell
  • Flush the Top Input valve
  • Close all of the valves on the Triaxial cell
  • Turn the Base Pressure Valve to the Vent position
  • Turn the External/Burette Valve for the Top Pressure Burette to the Burette position
  • To Perform Falling Head, Rising Tail Permeability

Frequently asked questions

How is the area of the burette calculated?

The area of the burette equals the known volume divided by the measured length.

Which valve position is used when flushing the Top Input valve?

Turn the Top Pressure burette assembly’s Fill/Drain valve to the Fill position and allow the water to drain.

What should be done after flushing the Top Input valve?

Tighten the nut that was loosened on the Top Input valve.

What position should the Base Pressure Valve be turned to?

The Base Pressure Valve is turned to the Vent position.

Download PDF (2.7 MB)

More Humboldt Manuals


View all Humboldt manuals →