Introduces the functions and features of the Kohler PIM module and provides installation instructions
This installation guide describes how to fit the Kohler PIM module and connect it to an OmniMetrix monitor on a generator. The steps cover drilling a hole in the PIM enclosure for the OmniMetrix 25 pin Data/Power cable, plugging that cable into the front panel of the monitor, mounting the monitor on the generator control enclosure or another suitable location, and attaching the antenna cable.
The guide lists the six on-board PIM relays and their factory default alarms, from Generator Running on Output 1 through Normal Source Failure on Output 6, and notes that OmniMetrix must be informed if the relays are programmed differently. A wiring table gives wire color, normal state, alarm state and terminal number for each connection, and the document states that Kohler Sitetech Software is required to program the RCD2 Controller and that installation should be confirmed by calling OmniMetrix.
| On-board relays | Six programmable relays |
|---|---|
| Data/Power cable connector | 25 pin |
| PIM Output 1 default alarm | Generator Running |
| PIM Output 2 default alarm | Common Fault |
| PIM Output 4 default alarm | Not in Auto |
| PIM Output 6 default alarm | Normal Source Failure |
It provides six on-board relays, used as connection points for alarms such as Generator Running, Common Fault, Low Battery Voltage, Not in Auto, Cool Down and Normal Source Failure.
The Kohler Sitetech Software is required to program the RCD2 Controller.
Horizontal surfaces are best, but the unit may be mounted vertically or upside down; if mounted vertically, install it with the cables down to keep water out of the enclosure.
PIM Output 5 is set by default to Cool Down.