Kohler PIM Module Installation Guide

Introduces the functions and features of the Kohler PIM module and provides installation instructions


Kohler PIM Module Installation Guide - cover page
Brand
Kohler
Category
Generator
Document type
Installation Guide
Language
English
Pages
2
File format
PDF
File size
262 KB
Published
31 October, 2023
Updated
31 October, 2023
MD5 checksum
261749EDB962CBFC69057B8F6BBBFA3E

About this manual

This installation guide describes how to fit the Kohler PIM module and connect it to an OmniMetrix monitor on a generator. The steps cover drilling a hole in the PIM enclosure for the OmniMetrix 25 pin Data/Power cable, plugging that cable into the front panel of the monitor, mounting the monitor on the generator control enclosure or another suitable location, and attaching the antenna cable.

The guide lists the six on-board PIM relays and their factory default alarms, from Generator Running on Output 1 through Normal Source Failure on Output 6, and notes that OmniMetrix must be informed if the relays are programmed differently. A wiring table gives wire color, normal state, alarm state and terminal number for each connection, and the document states that Kohler Sitetech Software is required to program the RCD2 Controller and that installation should be confirmed by calling OmniMetrix.

What's inside

  • Drilling the PIM enclosure
  • Kohler PIM module relay outputs
  • Connecting the OmniMetrix Data/Power cable
  • Mounting the OmniMetrix monitor
  • Attaching the antenna cable
  • RXT Transfer Switch and RBUS alarms
  • Programming the RCD2 Controller
  • Kohler PIM wiring table
  • Confirming installation with OmniMetrix

Specifications

On-board relaysSix programmable relays
Data/Power cable connector25 pin
PIM Output 1 default alarmGenerator Running
PIM Output 2 default alarmCommon Fault
PIM Output 4 default alarmNot in Auto
PIM Output 6 default alarmNormal Source Failure

Frequently asked questions

How many relays does the Kohler PIM module have?

It provides six on-board relays, used as connection points for alarms such as Generator Running, Common Fault, Low Battery Voltage, Not in Auto, Cool Down and Normal Source Failure.

What software is needed to program the RCD2 Controller?

The Kohler Sitetech Software is required to program the RCD2 Controller.

How should the OmniMetrix monitor be mounted?

Horizontal surfaces are best, but the unit may be mounted vertically or upside down; if mounted vertically, install it with the cables down to keep water out of the enclosure.

What is the default alarm for PIM Output 5?

PIM Output 5 is set by default to Cool Down.

Download PDF (262 KB)

More Kohler Manuals


View all Kohler manuals →