Oriental Motor Mitsubishi Electric Q series, QJ61BT11N through GX Works2 Installation

This document is an installation guide for Oriental Motor Mitsubishi Electric Q series, QJ61BT11N through GX Works2, providing a simple introduction to the connection and operation process of the network converter.


Oriental Motor Mitsubishi Electric Q series, QJ61BT11N through GX Works2 Installation - cover page
Brand
Orientalmotor
Category
Industrial Robot
Document type
Installation Guide
Language
Chinese
Pages
28
File format
PDF
File size
1.6 MB
Published
30 October, 2023
Updated
30 October, 2023
MD5 checksum
0317CECAAB920D9EB3B6C97B93837AE5

About this manual

This guide explains how to install and configure the Oriental Motor QJ61BT11N with CC-Link using GX Works2. It covers connection setup, parameter configuration, and monitoring functions. The guide assumes familiarity with the user manuals for the connected devices.

The document includes wiring diagrams, station address settings, and software configuration steps using MEXE02 or OPX-2A. It also explains how to monitor motor status via remote registers. This manual is written in Chinese.

What's inside

  • Connection Setup
  • Parameter Configuration
  • Station Address Setting
  • Monitoring Function
  • Software Configuration (GX Works2)

Specifications

Network ConverterNETC01-CC
Motor TypeAR Series CRK Series
Communication Speed625.000 bps

Frequently asked questions

What is the network converter used in this setup?

The network converter used is NETC01-CC, a CC-Link compatible converter.

How do I monitor motor status?

Use remote registers RWm0 and RWm1 to monitor motor status.

Download PDF (1.6 MB)

More Orientalmotor Manuals


View all Orientalmotor manuals →