Sungrow three-phase photovoltaic grid-connected inverter SG3.0RT / SG4.0RT / SG5.0RT / SG6.0RT / SG7.0RT / SG8.0RT / SG10RT / SG12RT / SG15RT / SG17RT / SG20RT User Manual

This document is the user manual for Sungrow three-phase photovoltaic grid-connected inverter SG3.0RT / SG4.0RT / SG5.0RT / SG6.0RT / SG7.0RT / SG8.0RT / SG10RT / SG12RT / SG15RT / SG17RT / SG20RT.


Sungrow three-phase photovoltaic grid-connected inverter SG3.0RT / SG4.0RT / SG5.0RT / SG6.0RT / SG7.0RT / SG8.0RT / SG10RT / SG12RT / SG15RT / SG17RT / SG20RT User Manual - cover page
Brand
Sungrow
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
125
File format
PDF
File size
19.9 MB
Published
27 October, 2023
Updated
27 October, 2023
Model
SG3.0RT
MD5 checksum
29EEDDD2518DEA922C699A1149959B2A

About this manual

This manual provides comprehensive guidelines for the installation, operation, and maintenance of Sungrow three-phase PV grid-connected inverters, covering models from SG3.0RT to SG20RT. It includes detailed safety instructions, mechanical mounting procedures, electrical connection steps for DC and AC sides, and configuration instructions for commissioning the system.

What's inside

  • Safety
  • Product Description
  • Unpacking and Storage
  • Mechanical Mounting
  • Electrical Connection
  • Commissioning
  • iSolarCloud App
  • System Decommissioning
  • Troubleshooting and Maintenance
  • Technical Data

Specifications

Max. efficiency98.50 %
European efficiency98.10 %
Dimensions370 mm x 480 mm x 195 mm
Weight21 kg
Degree of protectionIP65
Operating ambient temperature range-25℃ to +60℃
Max. operating altitude4000 m
Cooling methodSmart forced air cooling
CommunicationWLAN / Ethernet / RS485 / DI / DO
DC connection typeMC4 (Max. 6 mm 2 )

Frequently asked questions

Who is the intended target group for this manual?

The manual is intended for inverter owners and qualified personnel responsible for installation and commissioning.

What safety equipment is required when working on PV strings?

Operators must wear proper personal protective equipment such as a helmet, insulated footwear, and gloves.

How long must one wait after powering off the inverter before connecting/disconnecting connectors?

You must wait at least 10 minutes for the internal capacitors to discharge.

Which models are equipped with fans for cooling?

Only the SG15RT, SG17RT, and SG20RT models are equipped with fans.

Download PDF (19.9 MB)

More Sungrow Manuals


View all Sungrow manuals →