Sungrow MVS6250/MVS6800 MV Station Transportation and Installation Guide

This guide covers the transportation, mechanical installation, electrical connection, and routine maintenance for the Sungrow MVS6250 and MVS6800 MV Stations.


Sungrow MVS6250/MVS6800 MV Station Transportation and Installation Guide - cover page
Brand
Sungrow
Category
Other Electronics
Document type
Installation Guide
Language
English
Pages
65
File format
PDF
File size
2.1 MB
Published
29 October, 2026
Updated
29 October, 2026
MD5 checksum
1EEE86ADAC1430773724135D465662EA

About this manual

This manual provides instructions for qualified technical personnel regarding the transport, hoisting, foundation preparation, and securing of the MVS6250 and MVS6800 MV Station. It details safety rules, symbol explanations, and specific procedures for opening sealing plates and preparing the transformer room.

What's inside

  • About This Manual
  • Safety Instructions
  • Product Description
  • Identify and Store the MV Station
  • Mechanical Installation
  • Electrical Installation
  • Checking before Power-On
  • Troubleshooting
  • Routine Maintenance
  • Parameters

Specifications

Output power (MVS6250)6250 kVA@50℃
Output power (MVS6800)7186 kVA@25℃
Nominal voltage (MV Switchgear)20~38.5 kV
Dimensions6058 mm x 2896 mm x 2438 mm
Weight20,000 kg
Operating temperature range-35℃~+60°C

Frequently asked questions

Who is the target group for this manual?

This manual is intended for technical personnel responsible for transport, installation, and other operations on the MV Station.

What safety level does a 'DANGER' symbol indicate?

A DANGER symbol indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury.

What is the recommended tightening torque for an M10 screw?

The recommended tightening torque for an M10 screw is 34~40 N·m.

Download PDF (2.1 MB)

More Sungrow Manuals


View all Sungrow manuals →