Official installation guide for the Sungrow SG100kW PV grid-connected inverter, covering safety instructions, mechanical mounting, and electrical wiring.
This manual provides detailed setup information for the installation of the SG100KU PV grid-connected inverter. It is intended for qualified electricians and covers safety instructions, delivery checks, site design requirements, and step-by-step installation procedures.
The document outlines mechanical installation processes, including transport, positioning, and fastening to the floor. It also details electrical connections for DC input, AC output, grounding, and optional communication interfaces, along with specific cable sizing recommendations.
| Max. DC Voltage | 600Vdc |
|---|---|
| Rated Output Power | 100kW |
| Max. AC Output Current | 140A |
| Rated Grid Voltage | 480Vac |
| Weight | 900kg |
Installers must be qualified electricians only.
The earthing resistance should be less than 10 Ohms.