ADC ADC-FLEX-100 Flex IO Installation Guide

This guide covers the basics of setting up and mounting your Flex IO.


ADC ADC-FLEX-100 Flex IO Installation Guide - cover page
Brand
ADC
Document type
Installation Guide
Language
English
Pages
11
File format
PDF
File size
541 KB
Published
27 October, 2023
Updated
27 October, 2023
MD5 checksum
DCE6C7A448D22A845C2A988C55B826E3

About this manual

This guide provides instructions for installing the ADC-FLEX-100 Flex IO, including determining location, mounting with screws or zip ties, inserting batteries, and confirming communication. It also covers equipment included, wiring considerations, and troubleshooting steps. The device can monitor doors and gates using a magnet and supports loop input and relay output for integrating compatible devices.

What's inside

  • Overview
  • Equipment
  • Step 1: Determine location
  • Step 2: Add the Flex IO to an account
  • Step 3: Mount the Flex IO
  • Step 4: Insert the batteries
  • Step 5: Confirm communication
  • Post-installation checklist
  • Specifications
  • Regulatory information

Frequently asked questions

What is the Flex IO used for?

The Flex IO enables monitoring valuable property and assets anywhere LTE connectivity is available.

What batteries are required for the Flex IO?

AA 1.5 V lithium batteries are required; alkaline or any battery greater than 1.5 V should not be used.

What is the minimum cellular signal strength recommended for the Flex IO?

Alarm.com recommends a signal strength of 2 bars or greater.

How long is the expected battery life under normal conditions?

Under normal conditions, battery life is expected to be 2 years.

Download PDF (541 KB)

More ADC Manuals


View all ADC manuals →