This is a document about the pre-installation guide for the operating room
This document contains rough-in information for typical STERIS Integration installations, covering pre-installation requirements along with electrical expectations. Its primary purpose is to show customers and their contractors how rooms need to be prepared for the installation team. It is also intended to show typical equipment and configurations but is not intended to describe the final configuration nor the installation work to be done.
The guide outlines responsibilities for STERIS, the hospital, and the hospital designee, including site readiness examples. It details site preparation for both Touchpanel Control and Manual Control A/V Systems, specifying electrical outlet requirements, conduit schedules, and mounting instructions. Finally, it lists equipment specifications for racks, wall plates, monitors, cameras, and documentation stations.
| Heat load (Full size AV rack) | 750 watts=2600 BTU/Hr |
|---|---|
| Ventilation clearance | 2 inches |
| Ceiling hub electrical outlet | 110 VAC 20 amp service |
| Nurse Desk electrical outlets | Two (2) quad electrical outlets |
| Equipment Rack electrical outlets | Two (2) quad electrical outlets |
| Conduit diameter for AV runs | 2" diameter |
To show customers and contractors how rooms need to be prepared for the installation team and to show typical equipment and configurations.
No, it is not intended to describe the final configuration nor the installation work to be done.
A quad electrical outlet with 110 VAC 20 amp service on Emergency Power.
2 inches of clearance is required for ventilation.