Furuno DRS2D/DRS4D/DRS4A/DRS6A/DRS12A/DRS25A Radar Sensor Installation Manual

This document is the installation manual for Furuno's radar sensors DRS2D/DRS4D/ DRS4A/DRS6A/DRS12A/DRS25A. It mainly introduces the composition, installation, and connection of the product.


Furuno DRS2D/DRS4D/DRS4A/DRS6A/DRS12A/DRS25A Radar Sensor Installation Manual - cover page
Brand
Furuno
Category
Other Electronics
Document type
Installation Guide
Language
English
Pages
40
File format
PDF
File size
2.8 MB
Published
26 October, 2023
Updated
26 October, 2023
MD5 checksum
D5961CB3B681E8834DE768FD75DDA24F

About this manual

This manual provides installation instructions for Furuno Radar Sensors, specifically models DRS2D, DRS4D, DRS4A, DRS6A, DRS12A, and DRS25A. It details safety precautions regarding RF radiation and magnetic compass interference, along with system configuration options including Multi Function Displays and power supply units.

The guide covers specific mounting procedures for different models, including considerations for platform thickness and cable routing. It also provides detailed wiring instructions for the radar sensor, power supply units, and optional NMEA 2000 connections, referencing specific equipment lists and part numbers.

What's inside

  • SAFETY INSTRUCTIONS
  • SYSTEM CONFIGURATION
  • EQUIPMENT LISTS
  • MOUNTING CONSIDERATIONS
  • MOUNTING PROCEDURE FOR DRS2D/4D
  • MOUNTING PROCEDURE FOR DRS4A/6A/12A/25A
  • WIRING INSIDE DRS2D/4D
  • WIRING INSIDE DRS4A/6A/12A/25A
  • WIRING INSIDE POWER SUPPLY UNIT
  • OUTLINE DRAWINGS

Specifications

Operating Temperature Limit55 degrees centigrade
Mounting Platform Thickness (DRS2D/4D)6-10 mm
Mounting Platform Thickness (DRS4A/6A/12A/25A)5 mm or less

Frequently asked questions

What is the maximum operating temperature for the radar sensor?

The radar sensor must not be mounted where the temperature is more than 55 degrees centigrade.

What are the required bolt sizes for mounting platforms of different thicknesses?

Use M10x20 bolts for platforms 5 mm or less, M10x25 bolts for 6-10 mm platforms, and locally supplied bolts for thicker platforms.

What is the required torque for fastening the radome base to the platform?

The torque should be between 19.6-24.5 N m.

Download PDF (2.8 MB)

More Furuno Manuals


View all Furuno manuals →