This manual provides instructions for removing and disassembling the 2010 Toyota Prius engine.
This document is a service manual for the 2010 Toyota Prius, providing step-by-step instructions for engine removal and installation. It covers the disassembly of various components including engine hangers, throttle body, EGR pipes, intake manifold, fuel delivery system, and ignition coils. The manual also details the reassembly process, specifying torque values for bolts and clamps.
| Torque for Fuel Vapor Feed Pipe | 21 N·m (214 kgf·cm, 15ft·lbf) |
|---|---|
| Torque for Engine Oil Level Dipstick Guide Bolt A | 28 N·m (286 kgf·cm, 21ft·lbf) |
| Torque for Engine Oil Level Dipstick Guide Bolt B | 21 N·m (214 kgf·cm, 15ft·lbf) |
| Torque for Engine Hangers | 43 N·m (438 kgf·cm, 32ft·lbf) |
The torque specification for the engine hangers is 43 N·m (438 kgf·cm, 32ft·lbf).
A light coat of engine oil should be applied to a new O-ring before installation.