Kutai TCS4P125 Automatic Transfer Switch Control Unit Operation Manual

This manual introduces the basic functions and use methods of Kutai TCS4P125 Automatic Transfer Switch Control Unit (hereinafter referred to as TCS4P125).


Kutai TCS4P125 Automatic Transfer Switch Control Unit Operation Manual - cover page
Brand
KUTAI
Category
Industrial Supply
Document type
User Manual
Language
English
Pages
11
File format
PDF
File size
999 KB
Published
19 October, 2023
Updated
19 October, 2023
MD5 checksum
8236A15CC490157EF4A61BB8267706A9

About this manual

This manual covers the installation, operation, and maintenance of the TCS4P125 Automatic Transfer Switch Control Unit (TC-V2) designed for 3 Phase 4 Wire systems. The unit is intended for qualified personnel and includes safety precautions regarding high voltages.

What's inside

  • Introduction
  • Hardware Description
  • Function Description
  • Operation
  • Installation Instructions
  • Typical Wiring

Specifications

Rated Voltage250 Vac
Rated Current125 Amps
Number of Poles4P
Coil Operating Voltage110 / 220 Vac +/- 20%
Operating Temperature-20 to +60 ˚C
Operating Humidity0 to 95%
Weight2.0 kg +/- 2%

Frequently asked questions

What is the purpose of the TDNE setting?

TDNE provides a time delay when transferring from Normal to Emergency, adjustable from 0 to 99 seconds.

How do you enter programming mode?

To enter programming mode, push and hold the Program button for 10 seconds until the screen displays the version and programming sequence begins.

What does the Plant Exerciser feature do?

It provides for automatic test operation of the generator at a fixed interval of once per 1 to 4 weeks with a specific test day and time.

Download PDF (999 KB)

More KUTAI Manuals


View all KUTAI manuals →