JBMB-56S - JBMB-63S series centrifugal pump installation and operation instructions

JBMB-56S - JBMB-63S series centrifugal pump installation and operation instructions


JBMB-56S - JBMB-63S series centrifugal pump installation and operation instructions - cover page
Brand
Pentair
Document type
Installation Guide
Language
English
Pages
15
File format
PDF
File size
449 KB
Published
19 October, 2023
Updated
19 October, 2023
MD5 checksum
DFA3117EB932CD77C34BFC6FA018BB56

About this manual

This document provides installation and operating instructions for Pentair’s J-Series centrifugal pumps, including models JBMB-56S and JBMB-63S. It covers piping requirements, priming procedures, electrical wiring, and mechanical seal replacement. The guide emphasizes proper pipe sizing, air-tight connections, and safety precautions to avoid damage or hazards. It also includes wiring diagrams and fuse specifications for single-phase and three-phase motors, with voltage conversion instructions for dual-voltage models.

What's inside

  • Piping Requirements
  • Priming the Pump
  • Electrical Wiring
  • Mechanical Seal Replacement
  • Safety Precautions

Specifications

Recommended Fuse Rating15A for 1/3 HP, 20A for 1/2 HP
Pipe Suction Size1-1/4" for 1/3 HP, 2" for 3/4 HP

Frequently asked questions

How do I prime the pump?

Close the discharge valve, remove the priming plug, fill the pump with water until water flows out, replace the plug, start the pump, and slowly open the valve.

What is the recommended pipe size for suction?

Increase pipe size from pump tapping as shown in Table I. For example, 1-1/4" for 1/3 HP, 2" for 3/4 HP.

How do I change the motor voltage from 230V to 115V?

Turn off power, remove the motor cover, turn the voltage selector dial to 115V, and reinstall the cover.

Download PDF (449 KB)

More Pentair Manuals


View all Pentair manuals →