This document is a Geotech Product Recovery System installation manual, which mainly introduces the function, use method and maintenance method of the product
The Geotech Product Recovery System (PRS) is designed to efficiently collect free-floating hydrocarbons from monitoring wells with a diameter of 2 inches (5 cm) or more. The system consists of a stainless steel diaphragm pump, a skimmer connected with a floating intake cartridge (or float), a control panel, air lines, discharge lines, and an optional air compressor. The intake skimmer incorporates both a density float and an oleophilic/hydrophobic filter to differentiate between hydrocarbons and water. This manual is written in Spanish.
| Well Diameter | 2 inches (5 cm) or more |
|---|---|
| Air Supply Requirement | 1 cfm at 90 psi |
| Control Panel Capacity | Up to 4 pumps |
| Tank Full Sensor Limit | 50 feet (15 m) |
| Tank Full Sensor Activation | 11 inches (28 cm) |
The system is designed for monitoring wells of 2 inches (5 cm) or more in diameter.
Yes, up to four pumps can be managed from a single control panel.
The control panel must be mounted less than 50 feet (15 m) from the discharge tank.