EZ Dock EZ Trail Installation Instructions

This is an EZ Trail installation instruction document


EZ Dock EZ Trail Installation Instructions - cover page
Brand
EZ Dock
Category
Industrial Robot
Document type
Installation Guide
Language
English
Pages
11
File format
PDF
File size
4.2 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
378E0BA83370FFA12192A1E590AAC052

About this manual

This manual provides instructions for installing the EZ Trail dock system, which is designed for elevated or floating structures. It covers site-specific considerations such as water conditions, soil types, and intended usage (commercial vs. private). The guide details the necessary tools and hardware, including specific pipe sizes and bracket types required for different installation scenarios.

What's inside

  • Installation Site
  • Coupler Installation
  • Anchoring Pipe
  • SD Pipe Bracket Install
  • HD Pipe Bracket Install
  • Tools and Requirements
  • Safety Warnings

Specifications

Torque specification for coupler nut15 ft lbs
Minimum pipe embedding depththree feet
SD Pipe Bracket max water depth12 feet
SD Pipe Bracket max suspended height4 ft
HD Pipe Bracket max water depth17ft
HD Pipe Bracket max suspended height7 ft
HD Pipe Bracket max weight loading (non-suspended)62.5 lb/sq ft

Frequently asked questions

What is the recommended pipe embedding depth?

Pipes must be sufficiently embedded or screwed into the lake, river or ocean bed to a minimum depth of three feet.

Can the EZ Trail system be installed on the shore line?

Yes, an alternate method is to install the dock sections on the shore line and push them into the water.

Download PDF (4.2 MB)

More EZ Dock Manuals


View all EZ Dock manuals →