This document describes the maintenance methods of Euclid Chemical Epoxy & Urethane Floor Coating Systems, including protecting new floors and developing maintenance schedules.
This guide outlines steps to protect new floors during construction and establish a maintenance schedule based on usage. It details cleaning methods including mopping, power scrubbing, and pressure washing, along with equipment and recommended cleaners. It also covers inspection and repair procedures to ensure long-term durability.
Repair involves removing damaged coating, using the same product for repairs, mixing according to technical data, and allowing full cure before use.
Allow 24 to 72 hours, depending on the system.
Use construction paper, plywood, plastic sheeting, drop cloths, or cardboard.
Do not exceed 1,000 psi.