Euclid Chemical Epoxy & Urethane Floor Coating Systems Maintenance Guide
This guide outlines steps to protect new floors during construction and establish a maintenance schedule based on usage. It details cleaning methods including mopping, power scrubbing, and pressure washing, along with equipment and recommended cleaners. It also covers inspection and repair procedures to ensure long-term durability.
Repair involves removing damaged coating, using the same product for repairs, mixing according to technical data, and allowing full cure before use.
Covers: Protecting Your New Floor · Developing a Maintenance Schedule · Maintenance/Cleaning Equipment · Mop Cleaning · Power Scrubbing · Pressure Washing

Euclid Chemical Epoxy & Urethane Coatings Application Guide
This document provides general installation procedures for epoxy and urethane coatings manufactured by The Euclid Chemical Company. It emphasizes that contractors must consult individual product technical data sheets for specific details such as mixing ratios and coverage rates. The guide outlines essential steps for surface preparation, including cleaning, roughening concrete, and testing for moisture vapor emission rates or relative humidity before application.
Covers: Surface Preparation · Moisture Testing · Mixing Instructions · Neat Coatings · Aggregate Broadcast Coatings · Vinyl Chip Broadcast Coatings
Latest Euclid Chemical manuals
Euclid Chemical Epoxy & Urethane Floor Coating Systems Maintenance Guide
User Manual 4 pages · 192 KB · ENMaintenance guide for Euclid Chemical’s epoxy and urethane floor coating systems, covering protection, cleaning, and repair procedures.
Euclid Chemical Epoxy & Urethane Coatings Application Guide
User Manual 3 pages · 84 KB · ENA guide for applying Euclid Chemical epoxy and urethane coatings, covering surface preparation, moisture testing, mixing, and various application methods.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Euclid Chemical manuals
How long should a new floor be allowed to cure before traffic?
Allow 24 to 72 hours, depending on the system.
From: Euclid Chemical Epoxy & Urethane Floor Coating Systems Maintenance Guide
What should be used to cover a new floor during construction?
Use construction paper, plywood, plastic sheeting, drop cloths, or cardboard.
From: Euclid Chemical Epoxy & Urethane Floor Coating Systems Maintenance Guide
What is the minimum age required for new concrete and masonry before applying the coating?
New concrete and masonry must be at least 28 days old before the coating is applied.
From: Euclid Chemical Epoxy & Urethane Coatings Application Guide
What is the minimum tensile pull-off strength required for the prepared surface?
The tensile pull-off strength should be at least 250 psi (1.7 MPa) for the surface to be considered properly prepared.
From: Euclid Chemical Epoxy & Urethane Coatings Application Guide