Questions answered in Euclid Chemical manuals

How long should a new floor be allowed to cure before traffic?

Allow 24 to 72 hours, depending on the system.

From: Euclid Chemical Epoxy & Urethane Floor Coating Systems Maintenance Guide

What should be used to cover a new floor during construction?

Use construction paper, plywood, plastic sheeting, drop cloths, or cardboard.

From: Euclid Chemical Epoxy & Urethane Floor Coating Systems Maintenance Guide

What is the minimum age required for new concrete and masonry before applying the coating?

New concrete and masonry must be at least 28 days old before the coating is applied.

From: Euclid Chemical Epoxy & Urethane Coatings Application Guide

What is the minimum tensile pull-off strength required for the prepared surface?

The tensile pull-off strength should be at least 250 psi (1.7 MPa) for the surface to be considered properly prepared.

From: Euclid Chemical Epoxy & Urethane Coatings Application Guide