Arctic Air Reach-In Refrigerators and Freezers Installation, Operation & Maintenance Manual

This manual introduces the specifications, safety instructions, installation instructions, operating instructions and maintenance instructions of Reach-In Refrigerators and Freezers


Arctic Air Reach-In Refrigerators and Freezers Installation, Operation & Maintenance Manual - cover page
Brand
Arctic Air
Category
Refrigerators
Document type
User Manual
Language
English
Pages
20
File format
PDF
File size
3.1 MB
Published
17 October, 2023
Updated
17 October, 2023
MD5 checksum
98E5F53B39B631A348F9242A14354885

About this manual

This manual provides step-by-step instructions for installing, operating, and maintaining Arctic Air reach-in refrigerators and freezers. It covers site preparation, electrical connections, leveling, and safety precautions. It also includes wiring diagrams for specific models and maintenance procedures such as cleaning condenser coils and replacing doors.

The manual includes safety warnings, operational details like defrost cycles and temperature settings, and troubleshooting information for alarms and control indicators. It is intended for professional installers and maintenance personnel, with clear guidance on proper handling and compliance with electrical codes.

What's inside

  • Installation
  • Operation
  • Maintenance
  • Safety Instructions
  • Wiring Diagrams
  • Serial Number Location
  • Alarm Codes
  • Front Panel Controls

Specifications

Model AR3 Voltage/Hz/Ph115/60/1
Model AF3 Storage Capacity14.0 Cu-ft

Frequently asked questions

What is the recommended clearance for installing a reach-in refrigerator?

The unit requires a minimum of two inches of clearance from all walls and a minimum of 18 inches of clearance over the top of the unit.

How often does the defrost cycle occur?

Every 6 hours, the unit turns off and displays the defrost symbol to allow the evaporator coil to clear ice.

What should be done before performing maintenance on the unit?

Disconnect the unit from the electrical supply and apply a lockout tag to the electrical supply connection.

Download PDF (3.1 MB)

More Arctic Air Manuals


View all Arctic Air manuals →