Applied Biosystems 3500/3500xL Genetic Analyzer Installation Guide

This document is the installation manual of the Applied Biosystems® 3500/3500xL Genetic Analyzer, which introduces the preparation work required for the installation of the device.


Applied Biosystems 3500/3500xL Genetic Analyzer Installation Guide - cover page
Brand
Applied Biosystems
Document type
Installation Guide
Language
English
Pages
21
File format
PDF
File size
501 KB
Published
17 October, 2023
Updated
17 October, 2023
Model
3500xL
MD5 checksum
6D5A40E86BB8D9AF5F80A235C8B494F8

About this manual

This guide provides step-by-step instructions for preparing your site to install the Applied Biosystems 3500/3500xL Genetic Analyzer. It includes a site preparation checklist, installation workflow, and training information. The document outlines customer responsibilities, space and electrical requirements, and safety precautions. Installation typically takes 1.5 business days and includes basic operator training by a Life Technologies service representative.

Key requirements include adequate bench space, environmental controls (15–30°C, 20–80% humidity), and proper electrical outlets (AC 100–240 V, 50/60 Hz). The instrument must be installed in a BSL-3 or BSL-4 free area, and power must remain accessible for safety. A power line regulator is recommended in areas with voltage fluctuations beyond ±10%.

What's inside

  • Site Preparation Checklist
  • Installation Workflow
  • Customer Responsibilities
  • Site Requirements
  • Electrical Requirements
  • Safety Precautions
  • Training Information

Specifications

Instrument PowerAC 100-240 V ±10%, 50/60 Hz, 3.1 A, 320 VA
Computer PowerAC 100-240 V ±10%, 50/60 Hz, 2.1 A, 125 VA
Monitor PowerAC 100-240 V ±10%, 50/60 Hz, 1.5 A, 65 VA
Operating Temperature15 to 30°C (59 to 86°F)
Operating Humidity20 to 80% relative humidity, noncondensing
Instrument Dimensions (Closed Door)72 cm (28.3 in.) height, 61 cm (24 in.) depth, 61 cm (24 in.) width

Frequently asked questions

How long does the installation take?

Installation and testing takes about 1.5 business days.

What is the recommended power line regulator?

A 1.5-kVA power line regulator is recommended for areas with voltage fluctuations beyond ±10% of nominal voltage.

Download PDF (501 KB)