This manual describes the installation, commissioning and maintenance of the 39YA series air handling units.
This manual provides guidelines for the reception, transportation, installation, commissioning, and maintenance of Carrier 39YA Series Air Handling Units. It is intended for qualified personnel and covers general conditions, safety precautions, and specific procedures for handling the equipment. This manual is written in Spanish.
It is a guide for correct reception, transport, installation, startup, and maintenance of Carrier 39YA Air Handling Units.
Loads must not exceed 60 kg/m2, uniformly distributed and preferably on the profiles.
The clearance A must be maintained at 700-800 mm for any access point.
The unit must be started only after following the instructions in this manual and ensuring safety systems are effective.