This file is about the installation and maintenance instructions of the outdoor section of the SHP series split system heat pump
This manual provides instructions for the installation and maintenance of the A.A.C. SHP Series split system heat pump outdoor section. It details requirements for location, foundation, and refrigerant tubing connections, emphasizing safety precautions regarding electrical shock and refrigerant pressure.
| Maximum elevation difference | 20 feet |
|---|---|
| Maximum total line length | 50 feet |
| Minimum foundation height | 3 inches |
The equipment must be installed by trained and experienced service and installation technicians.
Adjust the charge at 0.60 oz. per foot of 3/8" liquid line and 1.2 oz. per foot of 1/2" line.
The pressure control opens at 10 psi and resets at 30 psi.