Construction Aggregates Manual State Materials Office Florida

This document is about construction materials, introducing sampling, testing and reporting requirements, and minimum requirements and continued approval requirements.


Construction Aggregates Manual State Materials Office Florida - cover page
Document type
Other
Language
English
Pages
43
File format
PDF
File size
1.6 MB
Published
16 October, 2023
Updated
16 October, 2023
MD5 checksum
980692701A3F9C7887F20F5248AD7D33

About this manual

This document serves as a guide for Aggregate Producers, the State, and District Materials Offices regarding the assignment of sampling and testing requirements. It establishes compliance with Chapter 14-103 of the Florida Administrative Code to ensure quality and uniformity in aggregate production.

The manual outlines specific procedures for initial source approval and continued approval for various materials such as coarse aggregate, fine aggregate (silica sand and screenings), base aggregate, and riprap. It includes detailed tables specifying the number of tests required per product code, grade, or stone size, along with approved test methods like AASHTO T-27 for Gradation and FM 1-T011 for Los Angeles Abrasion.

What's inside

  • Purpose
  • Authority
  • Scope
  • Sampling, Testing and Reporting
  • Initial Source Approval Requirements
  • Aggregate Compliance Limits and Standards
  • Generalized Aggregate Flow
  • Sieve Limits Appendices

Frequently asked questions

How many calendar days of production data are required for initial source approval of coarse and fine aggregate?

The submitted data must represent 30 calendar days of production.

What is the maximum quantity of riprap material in a single stockpile that allows for a specific set of approval tests?

The manual covers stockpiles up to 5,000 tons.

What is the minimum probability of compliance required for initial data submittal?

Data must have greater than 95.0% probability of complying with specifications.

Download PDF (1.6 MB)

Also Manuals