This document introduces the installation, operation and maintenance methods of wastewater pumps.
The document serves as a comprehensive guide for the installation, operation, and maintenance of the Wastewater Pump Model IM107R12. It covers essential safety procedures, pre-installation checks including oil level verification, lifting protocols using proper equipment, and piping requirements such as check valve installation.
Refill with an ASTM 150 turbine oil, such as Shell Turbo 32 or Sunoco Sunvis 932.
The strain relief nut should be torqued to 75 in. lbs.
No, standard units are not designed for use in swimming pools, open bodies of water, fountains, or waterfalls.