This document provides instructions for using the multi-machine synchronization test program, including hardware connections, IP address settings, and software functionality.
This manual provides instructions for the Multi-Machine Synchronization Test Program, covering hardware setup and network configuration. It explains how to connect the PC to the test instruments via a LAN hub or switch and how to link multiple instruments using a synchronization control box with serial cables. Special attention is given to grounding requirements and the prohibition of unplugging connections while powered. This manual is written in Chinese.
You must use a multi-machine synchronization control box and a standard 9-pin serial extension cable to link the control box to the 'BAK' interface of each instrument.
The connections between the synchronization box and the test instruments must be secured before testing, and you must absolutely never unplug them while the equipment is powered on.
The chassis grounds of all test instruments must be shorted together and reliably connected to earth ground to prevent floating potential.